Product


1. Equipment Overview
The building engineering IC card and remote meter reading system tr*ning device is based on the development trend and characteristics of the intelligent building industry, combined with the functions and applications of building intelligent technology, and guided by the work tasks of the building 5A subsystem. It is based on the comprehensive application and expansion of various technologies such as building intelligence, industrial automation, computer network communication, integrated wiring and system integration. It meets the system and principle demonstration, skill display, work task design and planning, tr*ning, process and result evaluation, assessment, appr*sal, competition, engineering project design and graduation design of technicians and vocational colleges in building intelligent equipment installation and operation, building equipment installation, automation control, computer network and communication system engineering and other related majors; it systematically tr*ns students' professional skills, practical hands-on skills (installation, wiring, wiring, programming, debugging, operation, m*ntenance and rep*r, etc.), design planning, communication, teamwork, efficiency awareness and innovative thinking, and at the same time cultivates their rigorous work style and good professionalism.
2. Technical indicators
(1) Power input: single-phase three-wire (third-party grounding), AC220V±10%, 50/60Hz;
(2) Safety protection: grounding, leakage (operating current ≤30mA), overvoltage, overload, short circuit;
(3) Power consumption of the whole machine: ≤300W;
Overall dimensions (width×height×depth): 1060mm×1900mm×800mm (industrial aluminum profile bracket);
3. Tr*ning projects
1. Understanding of IC card and remote meter reading system hardware
2. IC card three-meter charging system card making and basic software operation
3. IC card three-meter charging system meter and software advanced operation
4. IC card three-meter charging system system setting operation
5. IC card three-meter charging system business operation
6. IC card three-meter charging system function card management operation
7. IC card three-meter charging system query statistics operation
8. IC card three-meter charging system database operation
9. Understanding of basic functions of remote meter reading system
10. Remote meter reading system meter management operation
11. Remote meter reading system cost management operation
12. Remote meter reading system system management operation
13. System design and connection
14. Fault setting and troubleshooting
15. System structure and installation
4. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interface according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, the contents are as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), and schematic diagrams (you can enter the equipment from the schematic diagram). The equipment includes: sprinklers, water flow indicators, signal butterfly valves, exhaust valves, fire alarm controls, high-pressure gauges, high-level water tanks, Wia control cabinets, pressure-stabilizing tanks, flow switches, terminal water testing devices, dr*nage facilities, water pump connectors, hydraulic alarms, time delays, wet alarms, butterfly valves, check valves, fire pumps, safety pressure-stabilizing valves, and fire water tanks. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, and semi-transparent 3D models , so that the internal water flow can be seen. Equipped with practice module (built-in 4 multiple-choice questions, with prompts for correct and wrong choices) 4. Design layout: There are multiple-choice questions and calculation questions, each of which is scored, and the correct answer and score will be displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), practice (built-in 8 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, heptafluoropropane check valve, high-pressure hose, gas check valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire alarm controller. 3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with a practice module (built-in 3 multiple-choice questions, with prompts for correct and incorrect choices) 4. Design and layout: There are 6 multiple-choice questions, each with a score, and the correct answer and score will be displayed after submission C. Escape drill: Teaching in the form of a fun game, escaping from the burning room within a limited time, and making a wrong choice will directly enter the score interface. 5. M*n configuration
欢迎咨询YLLY-CB Building Engineering IC Card and Remote Meter Reading System Experimental Platform相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有YLLY-CB Building Engineering IC Card and Remote Meter Reading System Experimental Platform其他问题,可联系19957812178
The building engineering IC card and remote meter reading system tr*ning device is based on the development trend and characteristics of the intelligent building industry, combined with the functions and applications of building intelligent technology, and guided by the work tasks of the building 5A subsystem. It is based on the comprehensive application and expansion of various technologies such as building intelligence, industrial automation, computer network communication, integrated wiring and system integration. It meets the system and principle demonstration, skill display, work task design and planning, tr*ning, process and result evaluation, assessment, appr*sal, competition, engineering project design and graduation design of technicians and vocational colleges in building intelligent equipment installation and operation, building equipment installation, automation control, computer network and communication system engineering and other related majors; it systematically tr*ns students' professional skills, practical hands-on skills (installation, wiring, wiring, programming, debugging, operation, m*ntenance and rep*r, etc.), design planning, communication, teamwork, efficiency awareness and innovative thinking, and at the same time cultivates their rigorous work style and good professionalism.
2. Technical indicators
(1) Power input: single-phase three-wire (third-party grounding), AC220V±10%, 50/60Hz;
(2) Safety protection: grounding, leakage (operating current ≤30mA), overvoltage, overload, short circuit;
(3) Power consumption of the whole machine: ≤300W;
Overall dimensions (width×height×depth): 1060mm×1900mm×800mm (industrial aluminum profile bracket);
3. Tr*ning projects
1. Understanding of IC card and remote meter reading system hardware
2. IC card three-meter charging system card making and basic software operation
3. IC card three-meter charging system meter and software advanced operation
4. IC card three-meter charging system system setting operation
5. IC card three-meter charging system business operation
6. IC card three-meter charging system function card management operation
7. IC card three-meter charging system query statistics operation
8. IC card three-meter charging system database operation
9. Understanding of basic functions of remote meter reading system
10. Remote meter reading system meter management operation
11. Remote meter reading system cost management operation
12. Remote meter reading system system management operation
13. System design and connection
14. Fault setting and troubleshooting
15. System structure and installation
4. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interface according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, the contents are as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), and schematic diagrams (you can enter the equipment from the schematic diagram). The equipment includes: sprinklers, water flow indicators, signal butterfly valves, exhaust valves, fire alarm controls, high-pressure gauges, high-level water tanks, Wia control cabinets, pressure-stabilizing tanks, flow switches, terminal water testing devices, dr*nage facilities, water pump connectors, hydraulic alarms, time delays, wet alarms, butterfly valves, check valves, fire pumps, safety pressure-stabilizing valves, and fire water tanks. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, and semi-transparent 3D models , so that the internal water flow can be seen. Equipped with practice module (built-in 4 multiple-choice questions, with prompts for correct and wrong choices) 4. Design layout: There are multiple-choice questions and calculation questions, each of which is scored, and the correct answer and score will be displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), practice (built-in 8 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, heptafluoropropane check valve, high-pressure hose, gas check valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire alarm controller. 3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with a practice module (built-in 3 multiple-choice questions, with prompts for correct and incorrect choices) 4. Design and layout: There are 6 multiple-choice questions, each with a score, and the correct answer and score will be displayed after submission C. Escape drill: Teaching in the form of a fun game, escaping from the burning room within a limited time, and making a wrong choice will directly enter the score interface. 5. M*n configuration
Serial number | Equipment Name | quantity | unit | Remark |
1 | Vertical tr*ning platform | 1 | tower | |
2 | Mesh plate installation module | 8 | piece | |
3 | Expansion fixings for mesh panels | 100 | indivual | |
4 | Cable Management | 12 | indivual | |
5 | Power Management Module | 1 | tower | |
6 | Embedded programming host and display module | 1 | set | |
7 | IC card electric meter | 1 | tower | |
8 | IC card cold water meter | 1 | tower | |
9 | IC Card Gas Meter | 1 | tower | |
10 | IC card reader | 1 | tower | |
11 | IC Card | 10 | open | |
12 | Pulse gas meter | 2 | set | |
13 | Pulse water meter | 1 | tower | |
14 | Pulse meter | 1 | tower | |
15 | Collector | 2 | tower | |
16 | Concentrator | 1 | tower | |
17 | Network Controller | 1 | tower | |
18 | Simulation of electricity consumption system | 1 | set | |
19 | Simulating water consumption system | 1 | set | |
20 | Simulated gas consumption system | 1 | set | |
twenty one | Tubing Kits | 1 | set | |
twenty two | Managing Computers | 1 | tower | |
twenty three | Remote meter reading system software | 1 | set | |
twenty four | IC card prepayment system software | 1 | set | |
25 | Card issuing box | 1 | indivual | |
26 | 6-way PDU power supply | 1 | indivual | |
27 | 24-position Category 5e non-shielded socket patch panel | 1 | indivual | |
28 | 8P8C Category 5e non-shielded crystal head | 20 | indivual | |
29 | Category 5e non-shielded information socket module | 4 | indivual | |
30 | Single port 86 type information panel | 4 | indivual | |
31 | 86 type bottom box | 4 | indivual | |
32 | UTP Category 5e 4-p*r unshielded patch cord | 4 | strip | |
33 | UTP Category 5e 4-p*r unshielded cable | 100 | rice | |
34 | Special bridge | 1 | set | |
35 | Consumables and tools | 1 | set | Wires of various specifications, common electrical tools and cable testers, etc. |
欢迎咨询YLLY-CB Building Engineering IC Card and Remote Meter Reading System Experimental Platform相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有YLLY-CB Building Engineering IC Card and Remote Meter Reading System Experimental Platform其他问题,可联系19957812178