Product


Overview: The
intelligent building and electrical installation tr*ning device is a two-story building platform composed of an aluminum alloy frame and movable mesh panels , which simulates the first-floor machine room, second-floor residents, first-floor corridor, second-floor corridor, vertical shaft and building perimeter of a building. The building experimental tr*ning device room provides installation range for the front and back side walls and top walls, and also provides room doors, on which electric bolt locks, electromagnetic locks, door magnets and door closers can be installed. The building intelligent system experimental module can realize the installation and operation of various systems of intelligent buildings, such as "intercom access control and indoor security system" and "closed-circuit television monitoring and perimeter security system". The
"building electrical installation tr*ning system" is a two-story simulated building built with an aluminum alloy bracket and 17 mesh panels, which simulates the first-floor machine room, first-floor corridor, first-floor corridor door, second-floor corridor, second-floor corridor window, second-floor residents, second-floor residents' door, second-floor residents' window, vertical shaft and building perimeter of a building. The room provides installation ranges on the front and back side walls and top walls, on which various building intelligent devices can be installed; it also provides room doors and windows, on which electric bolt locks, electromagnetic locks, door magnets and window anti-theft detectors can be installed, so as to realize the installation and operation of various systems of intelligent buildings, such as "intercom access control and indoor security system" and "closed-circuit television monitoring and peripheral security system". Compared with the single-layer simulation floor, the two-layer simulation floor needs to consider the multi-floor structural relationship of the intelligent building. In addition to cultivating students' engineering construction ability, it can also cultivate their engineering design ability and engineering innovation ability, which meets the practical teaching needs of colleges and universities.
The installation method of the device is consistent with the actual project. Using self-tapping screws and expansion fixings for mesh plates, students can fix the device alone on one side of the simulation wall; the wiring method can choose to lay open wires through the wire trough (front of the mesh plate) or lay hidden wires through the wire management ring (back of the mesh plate).
Aluminum alloy bracket size: 3010mm×1305mm×2550mm (length×width×height)
Mesh plate size: 750mm×600mm×35mm (length×width×height) Virtual simulation software for electrical installation
of building and intelligent building Designed based on unity3d, users can choose different sizes of interactive interface according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the device from the schematic diagram). Equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, Weiya control cabinet, pressure regulating tank, flow switch, terminal water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water pool. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with exercise module (4 built-in multiple-choice questions, both correct and wrong choices are prompted) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score are displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, both correct and wrong choices are prompted), and schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, HFC-227 one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire alarm controller. 3. Principle demonstration: Demonstrate the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is translucent, and the internal gas can be seen. Equipped with practice module (3 built-in multiple-choice questions, correct and wrong choices have prompts) 4. Design layout: There are 6 multiple-choice questions, each question is scored, and the correct answer and score will be displayed after submission. C. Escape drill: Teaching in the form of fun games, escape from the burning room within a limited time, and wrong choices will directly enter the score interface. 3. M*n configuration
Note: Computer is optional.
Practice Projects
1. Understand and be familiar with various building intelligent devices
2. Install various wall devices in corresponding areas
3. Install and debug door devices such as electric bolts, electromagnetic locks and door magnets
4. Master the structure and principle of intercom access control and indoor security systems
5. Wiring, wiring and debugging of intercom access control and indoor security systems
6. Operation and accident drill of intercom access control monitoring management software
7. System structure project design of intercom access control and indoor security system based on two floors
8. Master the structure and principle of closed-circuit television monitoring and peripheral security system
9. Wiring, wiring and debugging of closed-circuit television monitoring and peripheral security system
10. Operation and accident drill of network video monitoring management software
11. System structure project design of closed-circuit television monitoring and peripheral security system based on two floors
欢迎咨询YLLYMN-3 Building Electrical and Intelligent Practical Teaching Simulation Experiment Platform相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有YLLYMN-3 Building Electrical and Intelligent Practical Teaching Simulation Experiment Platform其他问题,可联系19957812178
intelligent building and electrical installation tr*ning device is a two-story building platform composed of an aluminum alloy frame and movable mesh panels , which simulates the first-floor machine room, second-floor residents, first-floor corridor, second-floor corridor, vertical shaft and building perimeter of a building. The building experimental tr*ning device room provides installation range for the front and back side walls and top walls, and also provides room doors, on which electric bolt locks, electromagnetic locks, door magnets and door closers can be installed. The building intelligent system experimental module can realize the installation and operation of various systems of intelligent buildings, such as "intercom access control and indoor security system" and "closed-circuit television monitoring and perimeter security system". The
"building electrical installation tr*ning system" is a two-story simulated building built with an aluminum alloy bracket and 17 mesh panels, which simulates the first-floor machine room, first-floor corridor, first-floor corridor door, second-floor corridor, second-floor corridor window, second-floor residents, second-floor residents' door, second-floor residents' window, vertical shaft and building perimeter of a building. The room provides installation ranges on the front and back side walls and top walls, on which various building intelligent devices can be installed; it also provides room doors and windows, on which electric bolt locks, electromagnetic locks, door magnets and window anti-theft detectors can be installed, so as to realize the installation and operation of various systems of intelligent buildings, such as "intercom access control and indoor security system" and "closed-circuit television monitoring and peripheral security system". Compared with the single-layer simulation floor, the two-layer simulation floor needs to consider the multi-floor structural relationship of the intelligent building. In addition to cultivating students' engineering construction ability, it can also cultivate their engineering design ability and engineering innovation ability, which meets the practical teaching needs of colleges and universities.
The installation method of the device is consistent with the actual project. Using self-tapping screws and expansion fixings for mesh plates, students can fix the device alone on one side of the simulation wall; the wiring method can choose to lay open wires through the wire trough (front of the mesh plate) or lay hidden wires through the wire management ring (back of the mesh plate).
Aluminum alloy bracket size: 3010mm×1305mm×2550mm (length×width×height)
Mesh plate size: 750mm×600mm×35mm (length×width×height) Virtual simulation software for electrical installation
of building and intelligent building Designed based on unity3d, users can choose different sizes of interactive interface according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the device from the schematic diagram). Equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, Weiya control cabinet, pressure regulating tank, flow switch, terminal water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water pool. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with exercise module (4 built-in multiple-choice questions, both correct and wrong choices are prompted) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score are displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, both correct and wrong choices are prompted), and schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, HFC-227 one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire alarm controller. 3. Principle demonstration: Demonstrate the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is translucent, and the internal gas can be seen. Equipped with practice module (3 built-in multiple-choice questions, correct and wrong choices have prompts) 4. Design layout: There are 6 multiple-choice questions, each question is scored, and the correct answer and score will be displayed after submission. C. Escape drill: Teaching in the form of fun games, escape from the burning room within a limited time, and wrong choices will directly enter the score interface. 3. M*n configuration
Serial number | Device Name | quantity | unit | Remark |
1 | Aluminum alloy bracket | 1 | tower | Device m*n configuration |
2 | Mesh plate | 17 | piece | |
3 | Computer Mobile Cart | 1 | tower | |
4 | Round steel stool | 1 | open | |
5 | Ladders | 1 | Bundle | |
6 | Distribution Box | 1 | indivual | |
7 | Single-phase leakage protection switch | 1 | indivual | |
8 | Storage rack | 1 | tower | |
9 | Expansion fixings for mesh panels | 500 | indivual | |
10 | Cable management ring | 100 | indivual | |
11 | Fasteners, wires and special tools | 1 | Batch | |
12 | Single-phase three-position three-level socket | 3 | indivual | |
13 | Single-phase two-stage socket | 2 | indivual | |
14 | Single-phase three-level socket | 3 | indivual | |
15 | Surface mounted 86 base | 7 | indivual | |
16 | 18V DC switching power supply | 1 | indivual | Intercom access control and indoor security subsystem |
17 | 12V DC switching power supply | 1 | indivual | |
18 | Door bell | 1 | indivual | |
19 | Indoor extension | 1 | tower | |
20 | Electric Bolt Lock | 1 | Bundle | |
twenty one | Alarm Bell | 1 | indivual | |
twenty two | Passive infrared space detector | 1 | indivual | |
twenty three | Smoke detectors | 1 | indivual | |
twenty four | Gas detector | 1 | indivual | |
25 | Door magnetic switch | 1 | right | |
26 | Help button | 1 | indivual | |
27 | Inter-layer distributor | 1 | indivual | |
28 | Outdoor host | 1 | tower | |
29 | ID Card | 4 | open | |
30 | Electromagnetic lock | 1 | Bundle | |
31 | Electromagnetic lock controller | 1 | indivual | |
32 | Door opening button | 1 | indivual | |
33 | Network Device | 1 | indivual | |
34 | Management Center | 1 | tower | |
35 | Communication conversion module | 1 | indivual | |
36 | Communication Cable | 1 | strip | |
37 | Intercom access control monitoring management software | 1 | set | |
38 | Color monitor | 1 | tower | CCTV surveillance and perimeter security subsystem |
39 | DVR | 1 | tower | |
40 | harddisk | 1 | indivual | |
41 | switch | 1 | indivual | |
42 | Network jumper | 1 | strip | |
43 | Network Video Surveillance Management Software | 1 | set | |
44 | Changeup | 1 | tower | |
45 | Integrated movement | 1 | tower | |
46 | Bullet Camera | 1 | tower | |
47 | Automatic aperture lens | 1 | indivual | |
48 | Indoor omnidirectional PTZ | 1 | tower | |
49 | Smart Decoder | 1 | indivual | |
50 | Infrared camera | 1 | tower | |
51 | Camera bracket | 1 | indivual | |
52 | pickup | 1 | indivual | |
53 | Active infrared detector | 1 | right | |
54 | Passive infrared curt*n detector | 1 | indivual | |
55 | Sound and light alarm | 1 | indivual |
Practice Projects
1. Understand and be familiar with various building intelligent devices
2. Install various wall devices in corresponding areas
3. Install and debug door devices such as electric bolts, electromagnetic locks and door magnets
4. Master the structure and principle of intercom access control and indoor security systems
5. Wiring, wiring and debugging of intercom access control and indoor security systems
6. Operation and accident drill of intercom access control monitoring management software
7. System structure project design of intercom access control and indoor security system based on two floors
8. Master the structure and principle of closed-circuit television monitoring and peripheral security system
9. Wiring, wiring and debugging of closed-circuit television monitoring and peripheral security system
10. Operation and accident drill of network video monitoring management software
11. System structure project design of closed-circuit television monitoring and peripheral security system based on two floors
欢迎咨询YLLYMN-3 Building Electrical and Intelligent Practical Teaching Simulation Experiment Platform相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有YLLYMN-3 Building Electrical and Intelligent Practical Teaching Simulation Experiment Platform其他问题,可联系19957812178