News

Bull head planer simulation teaching experiment desk

Release Time : 2024-02-12  View Count :
Bull head planer simulation teaching experiment desk,Heating Pipeline Installation Tr--ning Desk

1. Product function:
1. Select transparent organic glass, and parts use aluminum parts to fully see the internal structure and movements of the product. There is no sandyst surface on the casting, and the surface accuracy of the processing parts is RA1.6.
2. All anatomical elements can operate normal mechanical operation.
3. Fully display each subtle structure and institutional assembly device.
4. Automatic operation and interpretation of the product operation process, so that students can intuitively understand the overall process.
2. Technical parameters:
** Plating length: not less than 250mm
Workbench ** Horizontal itinerary: not less than 400mm
Workbench ** Vertical itinerary: not less than 100mm
Work table size (length × width): not less than 200mm × 150mm
Blade frame ** Vertical itinerary: not less than 70mm
Blade frame ** Rotate angle: ± 30 °
Style reference size (long × width × height): not less than 870mm × 640mm × 650mm
M--n motor power: not less than 0.25 kilowatts
The machine tool can be a five -speed transmission, equipped with organic tiger pliers
3. Comprehensive integration of professional skills tr--ning virtual simulation system:
The software in the software can be rotated, magnified, reduced, and translated at 360 °. There are general interactive buttons: return, homepage, help. All virtual simulation tasks are prompted, and the software automatically hooks after a task. There is an experimental task above the tool library

Bull head planer simulation teaching experiment desk(图1)

Bull head planer simulation teaching experiment desk,Heating Pipeline Installation Tr--ning Desk

I. Overview
Pipeline and heating installation tr--ning device, pipeline and heating tr--ning room, pipeline and heating engineering technical tr--ning device, pipeline workers install water, dr--nage, sanitary facilities, heating and other pipeline systems for houses and industrial venues. Installation of pipelines such as galvanized steel pipes, PPR hot melting pipes, high -density PE ground heating pipes, PVC dr--nage pipes. During the installation process, various pipe joint thread connections are generally used, special accessories are connected, hot -melt connection, adhesive adhesive connection, and pipeline crimping can also be used for joints. In various types of building components, the installation and fixing of pipelines are an important part of work skills. The installation of terminal accessories such as faucet and corner valves, hygiene facilities and heating equipment are also important, including shower, washbasin, toilet sanitary facilities,, toilet sanitary facilities,, toilet sanitary facilities, and toilet sanitation facilities, and toilet sanitation facilities,, toilet sanitary facilities, and toilet sanitation facilities. The heating bag, radiator, etc. should have the knowledge and skills of pipeline and heating.
Second, pipeline and heating equipment, pipeline and heating tr--ning devices, pipeline and heating tr--ning assessment equipment technical performance:
1. Input voltage: three -phase and four -line (or five -line system) AC380V ± 10% 50Hz 50Hz
2. Working environment: The environmental temperature range is -5 ° C ~+40 ° C relative humidity <85%(25 ° C) altitude <4000m
3. Device capacity: <6kva
4. M--n device Dimensions: 3920X width 2000x height 2000mm
three. Pipeline and heating equipment, pipeline and heating tr--ning devices, pipeline and heating tr--ning assessment equipment m--n functions
1. For pipelines and heating skills according to the requirements, the ability to install, analyze, and m--nt--n fault detection, analysis, and m--ntenance according to professional standards. Understand industry safety standards, be able to choose appropriate materials and consumables, and be proficient in using various equipment. Self -system design, water dr--nage pipe installation, gas pipeline installation, heating pipe road installation, cold water pipe road installation, heat water pipe road installation, solar pipeline installation, etc.:
Module 1: Pipeline and heating system solution design.
Module 2: Installation of dr--nage pipelines (PVC pipe).
Module three: installation and testing of galvanized steel pipes.
Module 4: PPR tube installation and testing, including kitchen sink cabinets, shower shower, urine ponds, heating bags and other facilities.
Module 5: PPR tube and galvanized steel pipe speed.

欢迎咨询Bull head planer simulation teaching experiment desk相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有Bull head planer simulation teaching experiment desk其他问题,可联系19957812178